Monthly Archives: May 2014

Lift Engineering

This power plant exhaust duct lift weight was 47 tons and over 100’ in the air. We designed the lift beam, rigging and verified the duct would support the lift loads. We also provided a deflection analysis of the duct … Continue reading

Share
Posted in Finite Element, Steel | Leave a comment