This project required the evaluation of an existing roof system to support new HVAC equipment loads. The roof consisted of steel joists and an 86 foot long fabricated truss in the gymnasium. Additional design deliverables included modification to existing equipment supports and additional bracing to support new equipment.
Project Categories