Lift Engineering

This power plant exhaust duct lift weight was 47 tons and over 100’ in the air. We designed the lift beam, rigging and verified the duct would support the lift loads. We also provided a deflection analysis of the duct during the lift to show that the duct brick lining could be installed on the ground. This was a significant time and money savings for our client.

Duct Lift FEADuct Lift

 

Share